Located near London Victoria railway station and adjacent Buckingham Palace Road and Belgravia Place, this 1980’s commercial building has seven storeys and mainly consists of offices on the upper levels. The ground floor has undergone renovation and provides a remodelled reception for the office spaces and food and beverage retail outlets.
We were appointed to undertaken survey works to review the MEP services within the current building, then review the feasibility of the installation of low carbon alternative solutions to replace the existing gas fired boiler system. We detailed RIBA Stage 2 design solutions to inform the client and the wider design team as to our design philosophy for the services element of the project, with the carbon offset strategy in mind. This informed the detailed design stage of the scheme, the initial work of which was delivered to the client in Q3 2022.
The work was undertaken whilst the office tenants were in occupation and therefore required careful planning.